Cyril Ramaphosa πΏπ¦ @CyrilRamaphosa
We have removed the licensing requirement for embedded generation projects. As a result, the pipeline of private sector projects has grown to more than 100 projects with over 9,000 MW of capacity. https://t.co/3jSAttqSoi — PolitiTweet.org