Rep. Elise Stefanik @RepStefanik
$950,000 for Warren and Washington County Industrial Development Agency to complete design and engineering for the wastewater system, provide upgrades to and extension of the drinking water system, and fund the replacement of the entryway bridge — PolitiTweet.org