Rep. Garret Graves @RepGarretGraves
Project efficiency is not limited to highways. The West Shore flood control project was in the STUDY phase for 42 y… https://t.co/PVYyg323xZ — PolitiTweet.org
Created
Tue Feb 20 18:49:51 +0000 2018
Likes
2
Retweets
2
Source
Twitter for iPhone
View Raw Data
JSON DataView on Twitter
Likely AvailableRep. Garret Graves @RepGarretGraves
Project efficiency is not limited to highways. The West Shore flood control project was in the STUDY phase for 42 y… https://t.co/PVYyg323xZ — PolitiTweet.org