Mark Z. Barabak @markzbarabak
A 65-mile section of bullet train through the San Joaquin Valley that a contractor assured could be constructed much more cheaply, with radical design changes, has become another troubling and costly chapter in the high-speed rail project @RVartabedian https://t.co/wsFZKEpAC3 — PolitiTweet.org