Shelley Moore Capito @SenCapito
This is Phase 5 and the final phase of the Bluestone Dam Safety Assurance Mega Project. Phase 5 will rehabilitate the dam’s stilling basin, which is a structure in front of the dam designed to reduce the turbulence of the water passing through the dam. — PolitiTweet.org