
Mayor Karen Bass @MayorOfLA
The @MetroConnector crews have broken through to the 7th/Metro Station! They are building twin 1.9-mile tunnels under DTLA that will connect the @MetroLosAngeles Blue, Expo and Gold Lines to speed up trips through downtown and around L.A. More info → https://t.co/YHOk49ZXAh https://t.co/3oGLpIt3P5 — PolitiTweet.org